The most significant projected work is the construction of a building intended to accommodate the orphans. For the time being, the few children to be lodged in the orphanage are hosted by one of the people in charge of the orphanage. Thus, this project is urgent. Please note that the CEMI/DES has already has a plot where a two level building can be built.
The cost of construction amounts to roughly 62 800 €. A more technical study and detailed description of the project is underway at a local technical office which proposes the outlines below.

Cut of the plan of the orphanage Plan of a frontage

Plan of another frontage
In addition to the building, it will be necessary to invest in the material and the provisions so that the orphanage is operational. Hereafter is an approximate evaluation of the needs.
Examples of capital cost (calculation based on 20 children)
1- Cost of the materials for the dormitories and the refectory (PU and in euro)
|
N° |
Descriptive of the investment |
Unit |
Qty |
PU |
Amount |
|
1 2 3 4 5 6 7 8 9 |
Batch of 2 bunk beds Mattress per place Pillows Office chairs Tables Benches Tablecloths Mattress covers Mosquito nets |
U U U U U U M U U |
10 20 20 2 2 4 14 40 20 |
34,62 19,23 1,92 10 42,31 9,63 2,69 1,23 2,69 |
346,16 384,62 38,4 20 84,62 36,92 37,69 49,23 53,85 |
TOTAL : 1051,49 €
2- the cost of the materials of kitchen (PU and in euro)
TOTAL : 865,42 € |
3 Cost of the provisions per month (PU and in euro) )
TOTAL : 1213,85 € |